top of page
02_07_2018_22_36_44_5264025.jpg
MBDA UK Systems

BRAND delivered over £1,000,000 of LED products providing huge energy reduction across 5 sites in the UK across 30 buildings.  70% of the projects were to upgrade existing non-LED lighting and 30% was for new high-tech facilities in the North and East of England.

Emergency Lighting services for the project include an addressable stand-alone system with automated testing and reporting for centralized maintenance which was critical for a project of this scope.

The multitude of tasks undertaken throughout the 5 sites required a deep understanding of how spaces were to be used to ensure the right product delivered the desired solution.

bottom of page